ROUTE 89 over MOUNT HOPE RIVER

2.1 MI SOUTH OF ROUTE 44 · County 015, Connecticut · Built 1939 · 2 Lanes · 1,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
01254
Year Built
1939
Reconstructed
1986
Length
19.8 m (65 ft)
Max Span
18.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.