SIMPAUG TURNPIKE over METRO-NORTH RAILROAD

300-FT EAST O MARCHANT RD · County 001, Connecticut · Built 2012 · 2 Lanes · 1,800 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
05225
Year Built
2012
Length
12.2 m (40 ft)
Max Span
10.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Unknown
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.