ROUTE 53 over SAUGATUCK RIVER

2.6 MI N OF ROUTE 107 · County 001, Connecticut · Built 2016 · 2 Lanes · 3,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
01018
Year Built
2016
Length
24.3 m (79.7 ft)
Max Span
22.8 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
3,900
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.