COUNTY ROAD over HAMMONASSET RIVER
1.3 MI. EAST OF ROUTE 79 · County 009, Connecticut · Built 2022 · 2 Lanes · 163 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.412497, -72.632839
This bridge is in worse condition than 14.6% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 4 years old.
Nearby Bridges
ROUTE 148 over BROOK
Built 2015
ROUTE 79 over HAMMONASSET BROOK
Built 2015
ABNER LANE over POND MEADOW BROOK
Built 1998
ROUTE 77 over BROOK
Built 2011
CHATFIELD HOLLOW R over CHATFIELD HOLLOW BROOK
Built 2002
CHATFIELD HOLLOW R over CHATFIELD HOLLOW BROOK
Built 1934
ROUTE 80 over HAMMONASSET RIVER
Built 1934
ROUTE 80 over CHATFIELD HOLLOW BROOK
Built 1935
SAW MILL ROAD over PARMELEE BROOK
Built 2001
HEATHERWOOD DRIVE over BROOK
Built 2022
Bridge Details
- Structure #
- 04852
- Year Built
- 2022
- Length
- 14.2 m (46.6 ft)
- Max Span
- 12.2 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 163
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $2,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.