ROUTE 77 over BROOK

3.7 MI N OF ROUTE 80 · County 009, Connecticut · Built 2011 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
02483
Year Built
2011
Length
11.3 m (37.1 ft)
Max Span
9.1 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.