GROTON LONG PT RD over PALMER COVE

0.3 MI W OF ROUTE 215 · County 011, Connecticut · Built 1935 · 2 Lanes · 2,025 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
04675
Year Built
1935
Length
17.1 m (56.1 ft)
Max Span
15.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
2,025
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.