GROTON LONG POINT over AMTRAK RAILROAD

0.1 MI S OF ROUTE 215 · County 011, Connecticut · Built 1961 · 2 Lanes · 3,401 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03665
Year Built
1961
Length
41.5 m (136.2 ft)
Max Span
14.4 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
3,401
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Unknown
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.