BISHOP ROAD over GARDNER BROOK

400 FT SE OF ROUTE 163 · County 011, Connecticut · Built 2001 · 2 Lanes · 495 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
04587
Year Built
2001
Length
8.8 m (28.9 ft)
Max Span
3 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
495
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.