ROUTE 2 EASTBOUND over FITCHVLLE POND&BOZRAH ST

1.53MI WEST OF NORWICH TL · County 011, Connecticut · Built 1961 · 3 Lanes · 14,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00401
Year Built
1961
Reconstructed
1988
Length
84.5 m (277.2 ft)
Max Span
23.5 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
14,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.