WORTHINGTON RIDGE over MATTABESSET RIVER

0.2 MI S OF ROUTE 160 · County 003, Connecticut · Built 1996 · 2 Lanes · 464 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
04476
Year Built
1996
Length
16.8 m (55.1 ft)
Max Span
15.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
464
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$519,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.