ROUTE 9 SOUTHBOUND over ROUTE 372

0.15 MI W OF US ROUTE 5 · County 003, Connecticut · Built 1962 · 2 Lanes · 29,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01092B
Year Built
1962
Length
27.5 m (90.2 ft)
Max Span
26.5 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
29,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.