ROUTE 9 NORTHBOUND over FAIR VIEW CEMETERY ROAD
.5 MI SOUTH NEWINGTON TL · County 003, Connecticut · Built 1976 · 2 Lanes · 36,400 vehicles/day
Overall
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.679694, -72.764092
This bridge is in worse condition than 74.7% of bridges in County 003. The average bridge in Connecticut is 0 years old; this one is 50 years old.
Nearby Bridges
ROUTE 9 NORTHBOUND over BUSWAY-CT FASTRAK
Built 1976
ROUTE 9 SOUTHBOUND over BUSWAY - CT FASTRAK
Built 1976
ROUTE 9 SOUTHBOUND over EAST STREET #2
Built 1975
ROUTE 9 NORTHBOUND over EAST STREET #2
Built 1975
STANLEY STREET #1 over ROUTE 9 & RAMPS
Built 1977
ROUTE 9 SOUTHBOUND over SAINT MARYS CEMETERY
Built 1978
ROUTE 9 over PIPER BROOK
Built 1985
ROUTE 175 over SANDY BROOK
Built 2004
BILTMORE STREET over SANDY BROOK
Built 1956
ROUTE 72 TR 801 over ROUTES 174 & 9 SB
Built 1978
Bridge Details
- Structure #
- 04395
- Year Built
- 1976
- Length
- 63.4 m (208 ft)
- Max Span
- 9.1 m
- Width
- 18 m (59.1 ft)
- Lanes
- 2
- Daily Traffic
- 36,400
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.