ROUTE 9 NORTHBOUND over BUSWAY-CT FASTRAK

.75 MI SOUTH OF EXIT 29 · County 003, Connecticut · Built 1976 · 3 Lanes · 36,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
04301
Year Built
1976
Length
17.2 m (56.4 ft)
Max Span
15.3 m
Width
25.5 m (83.7 ft)
Lanes
3
Daily Traffic
36,400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.