ROUTE 59 over ROOSTER RIVER

0.3 MI N OF US ROUTE 1 · County 001, Connecticut · Built 1981 · 3 Lanes · 8,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
04347
Year Built
1981
Length
14.3 m (46.9 ft)
Max Span
13.1 m
Width
23.6 m (77.4 ft)
Lanes
3
Daily Traffic
8,700
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.