CAPITOL AVENUE over ROOSTER RIVER OVERFLOW

0.1 MI E OF ROUTE 59 · County 001, Connecticut · Built 1907 · 2 Lanes · 7,390 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
04194
Year Built
1907
Reconstructed
2017
Length
8.2 m (26.9 ft)
Max Span
7.2 m
Width
20.1 m (65.9 ft)
Lanes
2
Daily Traffic
7,390
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.