SOUTH PARK AVENUE over MILL RIVER

1.0 MI N OF ROUTE 15 · County 001, Connecticut · Built 2021 · 2 Lanes · 3,470 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
04213
Year Built
2021
Length
17.3 m (56.8 ft)
Max Span
16.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
3,470
Material
Prestressed Concrete
Design
Tee Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.