ROUTE 111 over ROUTE 15

ROUTE 15 EXIT NO. 48 · County 001, Connecticut · Built 2003 · 4 Lanes · 14,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00748
Year Built
2003
Length
20.4 m (66.9 ft)
Max Span
20.4 m
Width
53.7 m (176.2 ft)
Lanes
4
Daily Traffic
14,100
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.