CHAPEL STREET over PROV & WORC RAILROAD

100FT EAST OF EAST STREET · County 009, Connecticut · Built 1912 · 2 Lanes · 8,452 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
04058
Year Built
1912
Reconstructed
2005
Length
16.2 m (53.1 ft)
Max Span
15.5 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
8,452
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Unknown
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.