INTERSTATE 91 NB over CHAPEL STREET

0.1 M N OF I-95 · County 009, Connecticut · Built 1965 · 6 Lanes · 72,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
03040A
Year Built
1965
Reconstructed
2016
Length
22.9 m (75.1 ft)
Max Span
20.9 m
Width
44.1 m (144.7 ft)
Lanes
6
Daily Traffic
72,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.