I-95 TR 803 over MNRR & CRESCENT ST

ROUTE I-95 SB EXIT 15 · County 001, Connecticut · Built 1970 · 2 Lanes · 16,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03563
Year Built
1970
Reconstructed
1993
Length
82.3 m (270 ft)
Max Span
31.1 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
16,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.