INTERSTATE-95 over NORWALK RV HENDRICKS AVE
BETWEEN EXITS 15 & 16 · County 001, Connecticut · Built 1957 · 8 Lanes · 147,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
41.107367, -73.411008
This bridge is in worse condition than 73.7% of bridges in County 001. The average bridge in Connecticut is 0 years old; this one is 69 years old.
Nearby Bridges
INTERSTATE 95 over CRESCENT ST & MNRR
Built 1958
I-95 TR 803 over MNRR & CRESCENT ST
Built 1970
EAST AVENUE over INTERSTATE 95
Built 1957
I-95 N ON RAMP 316 over DRAINAGE
Built 1955
I-95 SB TR 803 over WEST AVENUE
Built 1970
INTERSTATE-95 over WEST AVENUE
Built 1956
US ROUTE 7 NB over CONNECTICUT AVE
Built 1970
US ROUTE 7 SB over CONNECTICUT AVENUE
Built 1970
US ROUTE 7 & RAMP over I-95 & TR802 RTE 7 RMP 1
Built 1970
U.S. ROUTE 7 NB over MAPLE STREET
Built 1970
Bridge Details
- Structure #
- 00059
- Year Built
- 1957
- Reconstructed
- 2022
- Length
- 277.4 m (910.1 ft)
- Max Span
- 41.1 m
- Width
- 37.1 m (121.7 ft)
- Lanes
- 8
- Daily Traffic
- 147,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $21,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.