ROUTE 9 over PAN AM RAILROAD

0.1 MI NORTH OF BERLIN TL · County 003, Connecticut · Built 1969 · 4 Lanes · 76,000 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03509
Year Built
1969
Length
12.6 m (41.3 ft)
Max Span
12.6 m
Width
210.3 m (690 ft)
Lanes
4
Daily Traffic
76,000
Material
Prestressed Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.