ROUTE 9 SOUTHBOUND over SR 571

AT ROUTE 9/ RT 372 · County 003, Connecticut · Built 1968 · 2 Lanes · 38,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
03506
Year Built
1968
Length
87.5 m (287.1 ft)
Max Span
45.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
38,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.