INTERSTATE-395 NB over ABANDONED RAILROAD

APPROX 1MILE SOUTH EX 100 · County 015, Connecticut · Built 1968 · 2 Lanes · 12,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03478
Year Built
1968
Reconstructed
1994
Length
32.6 m (107 ft)
Max Span
29.6 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
12,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.