ROUTE 200 over INTERSTATE-395

3 MI N OF US ROUTE 44 · County 015, Connecticut · Built 1967 · 2 Lanes · 4,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03474
Year Built
1967
Length
65.9 m (216.2 ft)
Max Span
22.9 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.