ROUTE 8 NORTHBOUND over NAUGATUCK RAILROAD CO.

0.4 MI N OF ROUTE 222 · County 005, Connecticut · Built 1966 · 2 Lanes · 11,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03355
Year Built
1966
Reconstructed
1994
Length
73.1 m (239.8 ft)
Max Span
25.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
11,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.