ROUTE 222 over NAUGATUCK RIVER OVERFLOW

0.2 MILE NORTH OF ROUTE 6 · County 005, Connecticut · Built 1958 · 2 Lanes · 8,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00468
Year Built
1958
Reconstructed
2000
Length
42.2 m (138.5 ft)
Max Span
20.4 m
Width
21.6 m (70.9 ft)
Lanes
2
Daily Traffic
8,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.