ROUTE 8 RAMP 131 over WEST MAIN STREET #1

NB ON-RAMP FROM RIVERSIDE · County 009, Connecticut · Built 1965 · 1 Lanes · 1,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
03203C
Year Built
1965
Length
40.8 m (133.9 ft)
Max Span
37.5 m
Width
9.6 m (31.5 ft)
Lanes
1
Daily Traffic
1,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.