ROUTE 8 NORTHBOUND over FREIGHT STREET

0.2 MILE NORTH OF I-84 WB · County 009, Connecticut · Built 1966 · 2 Lanes · 12,550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03198
Year Built
1966
Reconstructed
1989
Length
42.1 m (138.1 ft)
Max Span
21.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
12,550
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.