ROUTE 8 NORTHBOUND over METRO-NORTH RAILROAD
.7 MI NO NUGTCK WTBRY TL · County 009, Connecticut · Built 1966 · 3 Lanes · 26,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.524228, -73.044156
This bridge is in worse condition than 73% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 60 years old.
Nearby Bridges
ROUTE 8 SOUTHBOUND over METRO NORTH RAILROAD
Built 1966
ROUTE 8 NORTHBOUND over NAUGATUCK RV-LOCAL ROADS
Built 1966
ROUTE 8 SOUTHBOUND over NAUGATUCK RV-LOCAL ROADS
Built 1966
ROUTE 8 SOUTHBOUND over NICHOLS DRIVE
Built 1965
SOUTH LEONARD ST over METRO-NORTH RAILROAD
Built 1929
ROUTE 8 NORTHBOUND over NICHOLS DRIVE
Built 1965
SOUTH LEONARD ST over NAUGATUCK RIVER
Built 1956
BRISTOL STREET #1 over NAUGATUCK RIVER
Built 1956
ROUTE 8 over SR 847 - SOUTH MAIN ST.
Built 1965
SEVENTH STREET over ROUTE 8
Built 1965
Bridge Details
- Structure #
- 03179
- Year Built
- 1966
- Reconstructed
- 1980
- Length
- 214.5 m (703.7 ft)
- Max Span
- 51.7 m
- Width
- 14.5 m (47.6 ft)
- Lanes
- 3
- Daily Traffic
- 26,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $5,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.