ROUTE 8 NORTHBOUND over METRO-NORTH RAILROAD

.7 MI NO NUGTCK WTBRY TL · County 009, Connecticut · Built 1966 · 3 Lanes · 26,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03179
Year Built
1966
Reconstructed
1980
Length
214.5 m (703.7 ft)
Max Span
51.7 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
26,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$5,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.