ROUTE 8 NORTHBOUND over NAUGATUCK RV-LOCAL ROADS
.27 MI NORTH OF TOWN LINE · County 009, Connecticut · Built 1966 · 2 Lanes · 26,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
41.519225, -73.048064
This bridge is in worse condition than 73% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 60 years old.
Nearby Bridges
ROUTE 8 SOUTHBOUND over NAUGATUCK RV-LOCAL ROADS
Built 1966
BRISTOL STREET #1 over NAUGATUCK RIVER
Built 1956
ROUTE 8 SOUTHBOUND over METRO NORTH RAILROAD
Built 1966
ROUTE 8 NORTHBOUND over METRO-NORTH RAILROAD
Built 1966
ROUTE 8 over SR 847 - SOUTH MAIN ST.
Built 1965
ROUTE 8 SOUTHBOUND over NICHOLS DRIVE
Built 1965
ROUTE 8 NORTHBOUND over NICHOLS DRIVE
Built 1965
SOUTH LEONARD ST over METRO-NORTH RAILROAD
Built 1929
SOUTH LEONARD ST over NAUGATUCK RIVER
Built 1956
ROUTE 8 over ROUTE 8 RAMP 069
Built 1960
Bridge Details
- Structure #
- 03177
- Year Built
- 1966
- Length
- 184.7 m (606 ft)
- Max Span
- 45.7 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 26,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $5,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.