I-84 RAMP 115 over AMTRAK AND PARKING LOT

.33 MI N OF JCT SR 503 WB · County 003, Connecticut · Built 1965 · 2 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
03160D
Year Built
1965
Length
93.5 m (306.8 ft)
Max Span
23.5 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
8,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.