INTERSTATE-84 EB over AMTRAK;LOCAL RDS;PARKING

EASTBOUND · County 003, Connecticut · Built 1965 · 3 Lanes · 80,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
03160A
Year Built
1965
Reconstructed
2020
Length
991.2 m (3252 ft)
Max Span
43.3 m
Width
15.1 m (49.5 ft)
Lanes
3
Daily Traffic
80,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.