SR 702 over INTERSTATE-91 SOUTHBOUND

0.5 MI S OF EXIT 91 SB · County 009, Connecticut · Built 1965 · 1 Lanes · 4,600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03125
Year Built
1965
Length
75.3 m (247 ft)
Max Span
25.9 m
Width
9.6 m (31.5 ft)
Lanes
1
Daily Traffic
4,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.