INTERSTATE-91 SB over POND HILL ROAD

INTERSTATE-91 EXIT NO. 13 · County 009, Connecticut · Built 1965 · 4 Lanes · 36,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03122
Year Built
1965
Length
17.4 m (57.1 ft)
Max Span
16.2 m
Width
20.8 m (68.2 ft)
Lanes
4
Daily Traffic
36,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.