GILBERT AVENUE over INTERSTATE-91

1.19MI SOUTH JCT I91&RT99 · County 003, Connecticut · Built 1964 · 2 Lanes · 2,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03031
Year Built
1964
Reconstructed
1994
Length
169.5 m (556.1 ft)
Max Span
42.7 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
2,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.