ORCHARD STREET over INTERSTATE 91

0.4 MILE SOUTH OF EXIT 24 · County 003, Connecticut · Built 1964 · 2 Lanes · 3,470 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
03025
Year Built
1964
Reconstructed
1992
Length
110 m (360.9 ft)
Max Span
37.6 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
3,470
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.