ROUTE 154 over PLUM BANK CREEK

1.1 MI S OF US ROUTE 1 · County 007, Connecticut · Built 2021 · 2 Lanes · 3,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
02708
Year Built
2021
Length
14.3 m (46.9 ft)
Max Span
13.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
3,600
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.