INTERSTATE-95 over ELM STREET

0.8 MI N OF US ROUTE 1 · County 007, Connecticut · Built 1957 · 4 Lanes · 24,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00235
Year Built
1957
Reconstructed
1997
Length
36.3 m (119.1 ft)
Max Span
13.1 m
Width
28.9 m (94.8 ft)
Lanes
4
Daily Traffic
24,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.