ROUTE 130 over PEQUONNOCK RIVER

0.2 MILE WEST OF I-95 · County 001, Connecticut · Built 1975 · 4 Lanes · 14,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
02475
Year Built
1975
Reconstructed
2007
Length
160 m (524.9 ft)
Max Span
39.6 m
Width
24.1 m (79.1 ft)
Lanes
4
Daily Traffic
14,600
Material
Steel
Design
Movable - Lift
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$10,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.