US ROUTE 7 over NORWALK RIVER

0.1 MI N OF ROUTE 102 · County 001, Connecticut · Built 2017 · 2 Lanes · 18,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
02029
Year Built
2017
Length
20.7 m (67.9 ft)
Max Span
19.5 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
18,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.