US ROUTE 7 over COOPER POND BROOK

100 FT S OF ROUTE 102 · County 001, Connecticut · Built 1961 · 3 Lanes · 18,800 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
00535
Year Built
1961
Length
10.7 m (35.1 ft)
Max Span
5.2 m
Width
13.9 m (45.6 ft)
Lanes
3
Daily Traffic
18,800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.