MAYFLOWER STREET over INTERSTATE-84

BETWEEN EXITS 41 & 43 I84 · County 003, Connecticut · Built 1965 · 2 Lanes · 3,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01748
Year Built
1965
Reconstructed
2017
Length
79.2 m (259.8 ft)
Max Span
41.8 m
Width
16.4 m (53.8 ft)
Lanes
2
Daily Traffic
3,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.