INTERSTATE-84 EB over TROUT BK & TROUT BK DR

1 MILE EAST OF EXIT 41 · County 003, Connecticut · Built 1965 · 4 Lanes · 54,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01751
Year Built
1965
Reconstructed
1999
Length
96 m (315 ft)
Max Span
25.9 m
Width
20.3 m (66.6 ft)
Lanes
4
Daily Traffic
54,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.