INTERSTATE-395 NB over EAST FRANKLIN STREET

0.2 MI NORTH OF US RTE 6 · County 015, Connecticut · Built 1963 · 2 Lanes · 12,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01435
Year Built
1963
Reconstructed
1993
Length
16.8 m (55.1 ft)
Max Span
14 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,100
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.