INTERSTATE-395 SB over US ROUTE 6

2 MI NORTH OF SR 695 · County 015, Connecticut · Built 1963 · 3 Lanes · 12,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00500
Year Built
1963
Reconstructed
1993
Length
66.5 m (218.2 ft)
Max Span
21 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
12,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.