I-91 TR 839 over I-91-153 I-84-825 US44EB

I-91 SB EXIT 31 · County 003, Connecticut · Built 1961 · 1 Lanes · 900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
01428B
Year Built
1961
Reconstructed
1991
Length
211.9 m (695.2 ft)
Max Span
23.2 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.