INTERSTATE-84 over GREAT PLAIN ROAD

BETWEEN EXITS 6 & 7 · County 001, Connecticut · Built 1960 · 6 Lanes · 120,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
01191
Year Built
1960
Reconstructed
1988
Length
18.3 m (60 ft)
Max Span
16.8 m
Width
38.9 m (127.6 ft)
Lanes
6
Daily Traffic
120,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.