INTERSTATE-84 EB over DNBY TERM/HOUSATONIC RR

O.5 MI WEST OF US ROUTE 7 · County 001, Connecticut · Built 1962 · 3 Lanes · 41,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01182
Year Built
1962
Reconstructed
1984
Length
68.8 m (225.7 ft)
Max Span
25.3 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
41,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.