I-84 WB & RAMP 17 over US ROUTES 6 AND 202

AT THE I-84 ROUTE 7 SPLIT · County 001, Connecticut · Built 1962 · 5 Lanes · 50,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00457
Year Built
1962
Reconstructed
1987
Length
28 m (91.9 ft)
Max Span
26.5 m
Width
28.6 m (93.8 ft)
Lanes
5
Daily Traffic
50,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.